Skip to content

GitLab

  • Projects
  • Groups
  • Snippets
  • Help
    • Loading...
  • Help
    • Help
    • Support
    • Community forum
    • Submit feedback
  • Sign in / Register
GHC
GHC
  • Project overview
    • Project overview
    • Details
    • Activity
    • Releases
  • Repository
    • Repository
    • Files
    • Commits
    • Branches
    • Tags
    • Contributors
    • Graph
    • Compare
    • Locked Files
  • Issues 4,323
    • Issues 4,323
    • List
    • Boards
    • Labels
    • Service Desk
    • Milestones
    • Iterations
  • Merge Requests 388
    • Merge Requests 388
  • Requirements
    • Requirements
    • List
  • CI / CD
    • CI / CD
    • Pipelines
    • Jobs
    • Schedules
  • Security & Compliance
    • Security & Compliance
    • Dependency List
    • License Compliance
  • Operations
    • Operations
    • Incidents
    • Environments
  • Analytics
    • Analytics
    • CI / CD
    • Code Review
    • Insights
    • Issue
    • Repository
    • Value Stream
  • Wiki
    • Wiki
  • Snippets
    • Snippets
  • Members
    • Members
  • Collapse sidebar
  • Activity
  • Graph
  • Create a new issue
  • Jobs
  • Commits
  • Issue Boards
  • Glasgow Haskell Compiler
  • GHCGHC
  • Issues
  • #13037

Closed
Open
Opened Dec 25, 2016 by vanto@trac-vanto

Single-Stepping evaluation in GHCi

The goal is to have, in GHCi, the interim results provided by the function before the end result by a command available from the prompt, like this: for example:[[BR]]

Prelude> g op n [] = n ; g op n (h:t) = h op g op n t[[BR]]

Prelude> :stp[[BR]]

Prelude> g (*) 2 [1..3][[BR]]

1* (*) 2 [2,3][[BR]]

1*2 (*) 2 [3][[BR]]

1*2*3 (*) 2 [][[BR]]

1*2*3*2[[BR]]

12[[BR]]

Prelude>[[BR]]

And to quit the mode we write from the prompt a command like this[[BR]]

Prelude> :quitstp

Trac metadata
Trac field Value
Version 8.0.1
Type FeatureRequest
TypeOfFailure OtherFailure
Priority normal
Resolution Unresolved
Component GHCi
Test case
Differential revisions
BlockedBy
Related
Blocking
CC
Operating system
Architecture
Edited Mar 10, 2019 by Joachim Breitner
Assignee
Assign to
None
Milestone
None
Assign milestone
Time tracking
None
Due date
None
Reference: ghc/ghc#13037